Started Drilling Cabin Frame Leave a comment July 2, 2010 jason I didn’t have much time to work on the plane today, but I did manage to get the inner cabin frame joint strip drilled to the aft channel. I’m only drilling these out to #40 now, but they’ll get drilled out to #30 once everything is fit.