Installed Center Tunnel Nutplates

I installed the nutplates along both sides of the center tunnel in the seating area.  This uses a mixture of one and two legged nutplates.

Next, I reinstalled the front and rear flap motor covers so that I could fit the remaining parts of the center console.

Next, I started fitting the z-channels that will support the center tunnel cover.  There will be one of these on each side with a piece of 0.040″ sheet connecting them.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.